Driveways in Leicester
Block paving, resin, tarmac, gravel and concrete driveways, built from the ground up on a base that's dug out and compacted properly.
A driveway takes the weight of a car every day, in every season. What makes it last is the part you never see: how deep the ground is dug, how well the sub-base is compacted, and where the rainwater goes. We build that part first, then lay the surface you've chosen on top.
Every new driveway we lay comes with our 5-year guarantee on driveways and patios. We also repair and re-lay sunken or uneven sections.
5-year guarantee on driveways and patios
What's underneath
Built in layers
This is what goes under every driveway we lay. Tap a surface to see it on the same base.
What we do
Driveways
Block paving
Laid in herringbone, basketweave or straight courses, with a contrasting border if you want one. Sand is brushed into the joints and the surface is compacted.
Resin bound
A smooth, even finish of stones bound in resin, laid onto a suitable base. Good where you want a clean look with no loose gravel.
Tarmac
A hard-wearing, practical finish for larger drives and long runs, with edging to keep it neat.
Gravel
Gravel over a membrane and a firm base, with edging so it stays where it should. A quick and cost-effective option.
Concrete
Plain or finished concrete for drives and bases that need to be solid and simple.
Repairs
Lifting and re-laying sunken blocks, replacing broken edging and tidying tired drives.
How we work
Step by step
- 01
Free site visit
We measure, look at the levels and where water runs, and talk through materials and colours. You get a written quote.
- 02
Dig out
The old surface and soil come out to the depth the drive needs. Waste removal can be included in your quote, or you can arrange your own skip.
- 03
Build the base
Membrane, then MOT Type 1 sub-base laid in layers and compacted, with the falls set so water runs away from the house.
- 04
Edging and surface
Edging goes in first to hold everything, then the surface is laid, cut and finished.
- 05
Clean up
Joints filled, surface compacted and swept, and the site left tidy.
One of our jobs
Before & after
Dug out to bare ground, then a new base and herringbone block paving.


Questions
Driveways: FAQs
Resin or block paving: which is better?
Both last well when the base is right. Block paving can be lifted and re-laid in one spot if needed and comes in many colours and patterns. Resin gives a smooth, seamless look. We'll show you both on the visit and explain what suits your drive.
Do I need planning permission for a new driveway?
For a front garden over 5 square metres, the surface should let water drain through, or the water should run to a lawn or border on your own property. If it can't, planning permission is usually needed. We plan the drainage with you so the drive meets this.
How long does a driveway take?
It depends on the size, the material and how much has to be dug out. We give you an honest timescale with the quote.
Is there a guarantee?
Yes, our 5-year guarantee covers driveways and patios.
Free site visit
Ask for a quote
Tell us about the job and Alex will get back to you, usually the same day. Or send photos on WhatsApp.